The Mid South
2027 edition · Stillwater, Oklahoma, USA
- Date
- – [1]
Festival dates. Pro cycling is March 12; general cycling is March 13. The full timetable is still forthcoming.
- Registration
- Registration status unconfirmed [1]
An official 2027 registration page is published, but current category availability has not been verified.
The Mid South combines gravel cycling, running and live music in Stillwater. The 2027 program separates Friday's professional cycling race from Saturday's general rides. Registration categories use 50- and 100-mile names, while the organizer's description gives 58- and 106-mile courses. [1]
Course options
-
12 Mile Inspiration Ride [1]
12 mi · Climbing unconfirmed
Saturday ride; elevation and final route not verified.
-
50 Mile category [1]
58 mi · Climbing unconfirmed
Saturday. The 2027 event description specifies 58 miles despite the registration category name.
-
100 Mile category [1]
106 mi · Climbing unconfirmed
Saturday. The 2027 event description specifies 106 miles despite the registration category name.
-
Pro 100 cycling race [1]
Distance unconfirmed · Climbing unconfirmed
Friday, March 12. Exact professional-course distance not separately confirmed.
Practical information
- Support
- Neutral water and nutrition at cycling halfway points; neutral mechanical help for the 100-mile category. Private crews may assist only at the 100-mile halfway point, not elsewhere on course. [2]
- Entry cost
- Registration lists $28.87 for the Inspiration Ride, $151.50 for 50 Mile Open and $179.36 for 100 Mile Open. Currency and fee coverage are not explicitly confirmed in the extracted page. [1]
Sources and freshness
Checked dates record when we reviewed each source, not when the organizer last confirmed every detail. Information can change.
-
The Mid South 2027 — organizer's Movemint listing
Checked . 2027 dates, ride categories and displayed prices; exact course lengths differ from category names.
-
The Mid South — FAQs
Checked . Current FAQ explicitly refers to 2027 participants; safety-plan link still points to 2026 and is not reused.